Post by rooster49262 on Apr 21, 2008 7:36:11 GMT -6
Just thought that anyone that is headed south on 75 should know this.
Interstate 75: Resurfacing Project from I-280 to Michigan Border
Lucas County (6006-07): Expect intermittent lane and ramp closures in both directions of I-75 from I-280 to the Michigan line for pavement resurfacing. Major delays are possible. All work is weather permitting. Project complete: August 2008.
Effective through Monday, April 28, the right lane of southbound I-75 from Michigan/Ohio border to I-280 will be closed for bridge and pavement repair.
Through Monday, April 28 the entrance and exit ramps from Alexis Road to and from southbound I-75 will be closed. Entrance Ramp Detour: The entrance ramp from Alexis Road to northbound I-75; Erie Rd (Exit 5) in Michigan; SB I-75. Exit Ramp Detour: I-75, I-280/Greenbelt Parkway; I-75. Motorists can expect intermittent right lane closures in both directions on I-75 at the Alexis Road interchange.
Beginning Monday, April 21 through Thursday, April 24 from 8pm to 6am overnight, the right and center lanes of north and southbound I-75 from Michigan/Ohio border to I-280 will be closed for pavement and bridge deck repair.
From Friday, April 25 at 10pm until Saturday, April 26 at 8am, the right and center lanes of north and southbound I-75 from Michigan/Ohio border to I-280 will be closed for pavement and bridge deck repair.
2. Interstate: 75: Sign Inspection
Lucas County: Beginning Sunday, April 20, from 6am through 10am, motorists will experience intermittent lane restrictions on northbound I-75 at the Phillips Avenue exit ramp (Exit 206) for sign inspection. Additionally, the ramp from northbound I-75 to Philips Avenue (Exit 206) will be closed. All work is weather permitting.
3. Interstate 280: Veterans’ Glass City Skyway (VGCS) Main Span
Lucas County (493-01): Bridge over the Maumee River; widen to six lanes, modifying interchanges at Front Street and Greenbelt Parkway. . On Tuesday, April 22, from 9am through 3pm, the right lane of northbound I-280 on the main span of the VGCS will be closed for patchwork. Additionally, the ramp from Front Street to northbound I-280 will be closed. On Wednesday, April 23, the right lane of southbound I-280 on the main span of the VGCS will be closed for patchwork. Additionally, the ramp from southbound I-280 to Front Street will be closed. All work is weather permitting. Project complete: October 2008.
4. Interstate 280: Bridge Repair (Brown & Pickle Roads)
Wood County (529-07): Intermittent lane closures are possible for bridge repair work on I-280 at the Pickle Road overpass and Brown Road overpass in Oregon. Construction started on Pickle Road. Upon completion, construction on the Brown Road overpass will begin for 90 days. Project complete: October 2008.
Motorists will encounter intermittent lane restrictions on I-280 in both directions at Pickle Road nightly from 8pm to 6am until June 2008. Pickle Road at I-280 is closed until mid-June. All work is weather permitting. Detour: Wheeling Street; Brown Road; Coy Road.
5. Interstate 280: Ramp Reconstruction and Signalization
Wood County (324-07): Beginning Monday, April 14 until Friday, May 16, Lemoyne Road from Woodville Road to Curtice Road will be closed to thru traffic for road widening and shoulder work. The right lanes of Curtice Road from the southbound I-280 ramp on Curtice Road to Rue Bordeaux Road will also be closed at this time. Ramp closures on the off ramps from northbound I-280 between Woodville and Curtice Roads and the on ramp from Curtice Road to northbound I-280 are TBA. All work is weather permitting. Estimated completion: October 2008.
I also included 280 stuff to just for more info for everyone.
There is also work going on on US 127 from Leslie to the Rives Junction exit, not to bad to get through, but it is there. 127 south of Hudson MI is one lane at two different bridges in that area.
Hope this helps people going south make their plans for any delays.
Interstate 75: Resurfacing Project from I-280 to Michigan Border
Lucas County (6006-07): Expect intermittent lane and ramp closures in both directions of I-75 from I-280 to the Michigan line for pavement resurfacing. Major delays are possible. All work is weather permitting. Project complete: August 2008.
Effective through Monday, April 28, the right lane of southbound I-75 from Michigan/Ohio border to I-280 will be closed for bridge and pavement repair.
Through Monday, April 28 the entrance and exit ramps from Alexis Road to and from southbound I-75 will be closed. Entrance Ramp Detour: The entrance ramp from Alexis Road to northbound I-75; Erie Rd (Exit 5) in Michigan; SB I-75. Exit Ramp Detour: I-75, I-280/Greenbelt Parkway; I-75. Motorists can expect intermittent right lane closures in both directions on I-75 at the Alexis Road interchange.
Beginning Monday, April 21 through Thursday, April 24 from 8pm to 6am overnight, the right and center lanes of north and southbound I-75 from Michigan/Ohio border to I-280 will be closed for pavement and bridge deck repair.
From Friday, April 25 at 10pm until Saturday, April 26 at 8am, the right and center lanes of north and southbound I-75 from Michigan/Ohio border to I-280 will be closed for pavement and bridge deck repair.
2. Interstate: 75: Sign Inspection
Lucas County: Beginning Sunday, April 20, from 6am through 10am, motorists will experience intermittent lane restrictions on northbound I-75 at the Phillips Avenue exit ramp (Exit 206) for sign inspection. Additionally, the ramp from northbound I-75 to Philips Avenue (Exit 206) will be closed. All work is weather permitting.
3. Interstate 280: Veterans’ Glass City Skyway (VGCS) Main Span
Lucas County (493-01): Bridge over the Maumee River; widen to six lanes, modifying interchanges at Front Street and Greenbelt Parkway. . On Tuesday, April 22, from 9am through 3pm, the right lane of northbound I-280 on the main span of the VGCS will be closed for patchwork. Additionally, the ramp from Front Street to northbound I-280 will be closed. On Wednesday, April 23, the right lane of southbound I-280 on the main span of the VGCS will be closed for patchwork. Additionally, the ramp from southbound I-280 to Front Street will be closed. All work is weather permitting. Project complete: October 2008.
4. Interstate 280: Bridge Repair (Brown & Pickle Roads)
Wood County (529-07): Intermittent lane closures are possible for bridge repair work on I-280 at the Pickle Road overpass and Brown Road overpass in Oregon. Construction started on Pickle Road. Upon completion, construction on the Brown Road overpass will begin for 90 days. Project complete: October 2008.
Motorists will encounter intermittent lane restrictions on I-280 in both directions at Pickle Road nightly from 8pm to 6am until June 2008. Pickle Road at I-280 is closed until mid-June. All work is weather permitting. Detour: Wheeling Street; Brown Road; Coy Road.
5. Interstate 280: Ramp Reconstruction and Signalization
Wood County (324-07): Beginning Monday, April 14 until Friday, May 16, Lemoyne Road from Woodville Road to Curtice Road will be closed to thru traffic for road widening and shoulder work. The right lanes of Curtice Road from the southbound I-280 ramp on Curtice Road to Rue Bordeaux Road will also be closed at this time. Ramp closures on the off ramps from northbound I-280 between Woodville and Curtice Roads and the on ramp from Curtice Road to northbound I-280 are TBA. All work is weather permitting. Estimated completion: October 2008.
I also included 280 stuff to just for more info for everyone.
There is also work going on on US 127 from Leslie to the Rives Junction exit, not to bad to get through, but it is there. 127 south of Hudson MI is one lane at two different bridges in that area.
Hope this helps people going south make their plans for any delays.